Before starting production on any industrial sewing machine or automated equipment supplied by AE Sewing Machines, it is important to complete a full initial setup and verification process.
Carrying out these checks helps ensure safe operation, consistent stitch quality, and reliable performance from the outset. Skipping setup steps can lead to avoidable faults, poor results, or unnecessary downtime.
Industrial sewing machines are shipped with protective packaging and securing components to prevent movement during transport.
Before powering on the machine:
Remove all transit packaging materials
Remove any securing brackets, bolts, or restraints used for transport
Check that all moving parts are free to operate
Failure to remove transport restraints may cause damage when the machine is powered on.
Thread the machine carefully using the supplied threading diagram.
Ensure that:
Thread follows the correct path
Guides and tension points are correctly engaged
The correct thread type is used for the application
Incorrect threading is one of the most common causes of early operational issues and stitch faults.
If applicable to your machine:
Check oil levels are within the recommended range
Inspect lubrication points
Confirm that automatic lubrication systems (if fitted) are functioning correctly
Operating a machine without proper lubrication can cause premature wear or damage.
Once mechanical checks are complete:
Connect the machine to the appropriate power supply
Connect any peripherals or accessories, such as control panels or automation components
Ensure all connections are secure before powering on
Electrical connections should only be made once the machine is fully prepared.
Before beginning production:
Use scrap material that matches the intended application
Run the machine at a reduced speed
Check stitch quality, tension, and consistency
Make any necessary adjustments before proceeding.
Only begin full production once:
The machine operates smoothly
Stitch quality meets requirements
No unusual noise or vibration is present
Taking time to verify setup before production reduces rework, material waste, and downtime.
Completing an initial setup checklist helps ensure:
Safe and compliant operation
Consistent product quality
Reduced risk of early faults
Longer machine lifespan
AE Sewing Machines recommends completing all setup checks before starting production on any new or recently installed equipment.

Important notice
The information provided in this article is intended for general guidance only. Operating procedures, safety requirements, and compliance obligations may vary depending on the specific machine, configuration, application, and working environment. Always follow the instructions supplied with your equipment and ensure work is carried out by suitably trained and competent personnel.
To the fullest extent permitted by law, AE Sewing Machines shall not be liable for any loss, damage, or injury arising from the use of this guidance where equipment is used incorrectly, modified, or operated outside the manufacturer’s recommendations.

Need further support or looking to optimise your setup?
AE Sewing Machines offers technical support, servicing, genuine spare parts, upgrades, and automation solutions to help improve reliability, efficiency, and long-term performance.
If you require professional assistance, training, or would like to discuss service or support options, our team will be happy to help.
That's all for now, speak soon
AE Sewing Machines
Advance Enterprises Automation Ltd
Industrial Sewing Machines, Automation & Support